Westminster CentreThis project consisted of the demolition of an existing two story cinema, which was replaced with 3 stories of office space, and street level retail.

The 2nd floor cinema had a sloping concrete floor, which was infilled with a sloping steel stud pony wall system to completely level the floor for office use.

Architect: Musson Cattell Mackey Partnership

Contractor: PCL Constructors Westcoast

Scope of Work:

  • Steel Stud
  • Batt Insulation
  • Interior / Exterior Drywall
  • Suspended Acoustical Ceilings